University Project
University Project
Limits: US 290 East to Martin Luther King Jr. Boulevard
Project Details:
- Add two HOV managed lanes in both directions
- Reconstruct east-west crossings to be widened bridges at: Wilshire Boulevard, 38 1/2 Street, 32nd Street, Dean Keeton Street, and Manor Road
- Construct pedestrian-only bridge at 55th Street
- Construct north-to-south U-turn and reconstruct existing south-to-north U-turn at 51st Street
- Construct a single-point urban interchange at Airport Boulevard
- Construct pedestrian-only bridge at Martin Luther King Jr. Boulevard
- Construct a pedestrian-only bridge at Capital Plaza
- Constructing elevated red line crossing south of Airport Boulevard with pedestrian/bicycle access
- Reconstructing red line crossing at 4th Street
- Constructing blue line crossing at Riverside Drive
Anticipated construction start: Mid-2027
Estimated construction cost: $1.6 billion