CapMetro/Redline Bridges
CapMetro/Redline Bridges
Limits: at Airport Boulevard, 4th Street and Riverside Drive
Project Details:
- Constructing elevated red line crossing south of Airport Boulevard with pedestrian/bicycle access.
- Reconstructing redline crossing at 4th Street.
- Constructing Project Connect crossing at Riverside Drive.
Anticipated construction start: early 2026
Estimated construction cost: $228 million
Contractor: To be determined