CapMetro/Redline Bridges

Limits: at Airport Boulevard, 4th Street and Riverside Drive

Project Details:

  • Constructing elevated red line crossing south of Airport Boulevard with pedestrian/bicycle access.
  • Reconstructing redline crossing at 4th Street.
  • Constructing Project Connect crossing at Riverside Drive.

Anticipated construction start: early 2026

Estimated construction cost: $228 million

Contractor: To be determined