Limits: Airport Boulevard to Holly Street; Cesar Chavez Street to US 183
Project Details:
- Install two drainage tunnels.
- Construct pump station.
- Install access shafts along I-35 corridor.
Anticipated construction start: early 2025
Estimated construction cost: $748 million
Contractor: To be determined