Lady Bird Lake Project
Lady Bird Lake Project
Limits: Holly Street to SH 71/Ben White Boulevard
Project Details:
- Add two HOV managed lanes in both directions.
- Reconstruct Lady Bird Lake bridge.
- Construct a SPUI at Riverside Drive.
- Construct pedestrian-only bridge at Woodland Avenue.
- Accommodate current and future Capital Metro routes.
- Improve bicycle and pedestrian paths.
Anticipated construction start: late 2024
Estimated construction cost: $422 million
Contractor: To be determined