Lady Bird Lake Project
Lady Bird Lake Project
Limits: Holly Street to SH 71/Ben White Boulevard
Project Details:
- Add two HOV managed lanes in both directions
- Reconstruct Lady Bird Lake bridge
- Construct a SPUI at Riverside Drive
- Construct pedestrian-only bridge at Woodland Avenue
- Accommodate current and future Capital Metro routes
- Improve bicycle and pedestrian paths
Anticipated construction start: Mid-2024
Estimated construction cost: $422 million