Lady Bird Lake Project

Planned east pedestrian bridge along Lady Bird Lake bridge

Limits: Holly Street to SH 71/Ben White Boulevard

Project Details:

  • Add two HOV managed lanes in both directions
  • Reconstruct Lady Bird Lake bridge
  • Construct a SPUI at Riverside Drive
  • Construct pedestrian-only bridge at Woodland Avenue
  • Accommodate current and future Capital Metro routes
  • Improve bicycle and pedestrian paths

Anticipated construction start: Mid-2024

Estimated construction cost: $422 million