I-35 Capital Express South Project Plan – I-35/SH 45 Southeast Interchange – Audio Transcript

As we travel through the I-35/SH 45 Southeast interchange, the northbound entrance ramp would stay the same in the area, while the southbound SH 45 SE exit (223) would be removed, with travelers exiting the mainlanes just south of the interchange. Additionally, a southbound to northbound I-35 U-turn is being proposed to enhance access and reduce travel times as vehicles do not need to wait through a signal at SH 45 Southeast.

Continuing along the corridor, traffic would enter the northbound managed lanes just south of SH 45 Southeast, shown here with a green arrow.

Click here to go back to the I-35 Capital Express South – Project Plans page.